Best Well Installation in Lima, OH

Compare 6 local well installation providers in Lima. Verified listings with real contact info.

6 services listed

Quick Compare

Waldron Well Drilling

3 ★ (2 reviews)

Call

GH Bierly Well Drilling Inc

4.3 ★ (6 reviews)

Call

Sever Water Well Drilling

3 ★ (2 reviews)

Call

Waldron Well Drilling

5757 Rockport Rd, Columbus Grove, OH 45830

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

3 ★

2 reviews

general_contractor

GH Bierly Well Drilling Inc

10933 Ada Rd, Ada, OH 45810

4.3 ★

6 reviews

general_contractor

Sever Water Well Drilling

1830 Jennings Rd, Delphos, OH 45833

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

3 ★

2 reviews

general_contractor

Maas Brothers Drilling

200 Woodland Dr, Ottawa, OH 45875

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

5 ★

5 reviews

general_contractor

Stoepfel Drilling Co

12245 St, 12245 OH 115, OTTAWA

5 ★

1 reviews

general_contractor

Mason Well Drilling

19628 Township Rd 59, Rawson, OH 45881

5 ★

2 reviews

general_contractor

Frequently Asked Questions

How much does a complete well installation cost in Pennsylvania?

A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.

What's included in a complete well installation?

A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.

How long does it take to install a complete well system?

The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.

More Well Installation Nearby

Related Services in Lima

All services in Lima, OH →