Best Well Installation in Bellefontaine, OH
Compare 6 local well installation providers in Bellefontaine. Verified listings with real contact info.
6 services listed
Quick Compare
Affordable Well & Pump Services
Bellefontaine, OH 43311, USA
2 ★
2 reviews
Hannah’s/Britenstine Well Drilling
3077 OH-292, West Mansfield, OH 43358
4.7 ★
3 reviews
Eaton Well Drilling and Pump Service
10478 Co Rd 41, West Liberty, OH 43357
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.8 ★
98 reviews
Bushong Drilling
25954 Yearsley Rd, Raymond, OH 43067
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.9 ★
13 reviews
Crabtree Drilling, LLC
3882 Snyder Domer Rd, Springfield, OH 45502
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.6 ★
22 reviews
GH Bierly Well Drilling Inc
10933 Ada Rd, Ada, OH 45810
4.3 ★
6 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.