Best Well Installation in Marysville, OH
Compare 8 local well installation providers in Marysville. Verified listings with real contact info.
8 services listed
Quick Compare
Bushong Drilling
25954 Yearsley Rd, Raymond, OH 43067
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.9 ★
13 reviews
Eaton Well Drilling and Pump Service
10478 Co Rd 41, West Liberty, OH 43357
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.8 ★
98 reviews
Hannah’s/Britenstine Well Drilling
3077 OH-292, West Mansfield, OH 43358
4.7 ★
3 reviews
Ellsworth Well & Pump
356 W Main St, Waldo, OH 43356
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
23 reviews
R C Barry
6531 W Broad St, Galloway, OH 43119
Monday: 7:00 AM – 5:00 AM | Tuesday: 7:00 AM – 5:00 AM | Wednesday: 7:00 AM – 5:00 AM | Thursday: 7:00 AM – 5:00 AM | Friday: 7:00 AM – 5:00 AM | Saturday: Closed | Sunday: Closed
4.5 ★
27 reviews
Cantrell Well Drilling Inc
3416 Dover Rd, Columbus, OH 43204
5 ★
8 reviews
Mount Water Well Drilling
595 S 3rd St, Columbus, OH 43215
Monday: 9:00 AM – 5:00 PM | Tuesday: 9:00 AM – 5:00 PM | Wednesday: 9:00 AM – 5:00 PM | Thursday: 9:00 AM – 5:00 PM | Friday: 9:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
3.6 ★
18 reviews
Seismic Drilling
1219 N Main St, Marion, OH 43302
Monday: 9:00 AM – 5:00 PM | Tuesday: 9:00 AM – 5:00 PM | Wednesday: 9:00 AM – 5:00 PM | Thursday: 9:00 AM – 5:00 PM | Friday: 9:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.7 ★
22 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.