Best Well Installation in Celina, OH

Compare 4 local well installation providers in Celina. Verified listings with real contact info.

4 services listed

Quick Compare

Quinter Well Drilling LLC

5 ★ (21 reviews)

Call

Dellinger Bros., LLC Well Drilling

5 ★ (10 reviews)

Call

Sever Water Well Drilling

3 ★ (2 reviews)

Call

Quinter Well Drilling LLC

2 Main St, Burkettsville, OH 45310

Monday: 8:00 AM – 4:00 PM | Tuesday: 8:00 AM – 4:00 PM | Wednesday: 8:00 AM – 4:00 PM | Thursday: 8:00 AM – 4:00 PM | Friday: 8:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed

5 ★

21 reviews

general_contractor

Dellinger Bros., LLC Well Drilling

12346 SR-49, Willshire, OH 45898

Monday: 7:30 AM – 6:00 PM | Tuesday: 7:30 AM – 6:00 PM | Wednesday: 7:30 AM – 6:00 PM | Thursday: 7:30 AM – 6:00 PM | Friday: 7:30 AM – 6:00 PM | Saturday: 8:00 AM – 5:00 PM | Sunday: Closed

5 ★

10 reviews

general_contractor

Sever Water Well Drilling

1830 Jennings Rd, Delphos, OH 45833

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

3 ★

2 reviews

general_contractor

Wiley Well Drilling

900 N 650 E, Union City, IN 47390

Monday: 7:00 AM – 4:00 PM | Tuesday: 7:00 AM – 4:00 PM | Wednesday: 7:00 AM – 4:00 PM | Thursday: 7:00 AM – 4:00 PM | Friday: 7:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed

4.8 ★

37 reviews

general_contractor

Frequently Asked Questions

How much does a complete well installation cost in Pennsylvania?

A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.

What's included in a complete well installation?

A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.

How long does it take to install a complete well system?

The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.

More Well Installation Nearby

Related Services in Celina

All services in Celina, OH →