Best Well Installation in Wooster, OH

Compare 12 local well installation providers in Wooster. Verified listings with real contact info.

12 services listed

Quick Compare

BLACKSTONE LAWN CARE

5 ★ (9 reviews)

Call

Hagen Well Service

4.8 ★ (5 reviews)

Call

Flinner Drilling Inc.

4.7 ★ (30 reviews)

Call

BLACKSTONE LAWN CARE

639 Spink St, Wooster, OH 44691

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

5 ★

9 reviews

general_contractor

Hagen Well Service

474 Industrial Blvd, Wooster, OH 44691

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

4.8 ★

5 reviews

Flinner Drilling Inc.

2031 Millersburg Rd, Wooster, OH 44691

Monday: 7:30 AM – 5:00 PM | Tuesday: 7:30 AM – 5:00 PM | Wednesday: 7:30 AM – 5:00 PM | Thursday: 7:30 AM – 5:00 PM | Friday: 7:30 AM – 5:00 PM | Saturday: Closed | Sunday: Closed

4.7 ★

30 reviews

service

Ohio Drilling Company

2405 Bostic Blvd SW, Massillon, OH 44647

Monday: 8:00 AM – 4:00 PM | Tuesday: 8:00 AM – 4:00 PM | Wednesday: 8:00 AM – 4:00 PM | Thursday: 8:00 AM – 4:00 PM | Friday: 8:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed

4.7 ★

7 reviews

general_contractor

Duncan Drilling Co

1006 Co Hwy 2796, Perrysville, OH 44864

Monday: 8:00 AM – 8:00 PM | Tuesday: 8:00 AM – 8:00 PM | Wednesday: 8:00 AM – 8:00 PM | Thursday: 8:00 AM – 8:00 PM | Friday: 8:00 AM – 8:00 PM | Saturday: 8:00 AM – 8:00 PM | Sunday: Closed

5 ★

13 reviews

general_contractor

Pugh Well & Pump Inc

5548 Manchester Rd, New Franklin, OH 44319

4.7 ★

45 reviews

general_contractor

David D Fowler Well & Pump Softener Sales & Service

981 Bevan St, Akron, OH 44319

Monday: 7:00 AM – 7:00 PM | Tuesday: 7:00 AM – 7:00 PM | Wednesday: 7:00 AM – 7:00 PM | Thursday: 7:00 AM – 7:00 PM | Friday: 7:00 AM – 7:00 PM | Saturday: 7:00 AM – 7:00 PM | Sunday: 7:00 AM – 7:00 PM

4.7 ★

56 reviews

general_contractor

Yoder Drilling & Geothermal Inc

Northwest, 997 OH 93, SUGARCREEK

Monday: 7:30 AM – 4:30 PM | Tuesday: 7:30 AM – 4:30 PM | Wednesday: 7:30 AM – 4:30 PM | Thursday: 7:30 AM – 4:30 PM | Friday: 7:30 AM – 4:30 PM | Saturday: Closed | Sunday: Closed

4.8 ★

34 reviews

general_contractor

Depew Well Drilling Inc

3459 Granger Rd, Medina, OH 44256

Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed

4.8 ★

98 reviews

general_contractor

Akron Well Drilling

3867 W Market St #239, Akron, OH 44333

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

3.8 ★

4 reviews

general_contractor

Jamison Well Drill & Pump Services

258 Central Ave, Mansfield, OH 44905

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

4.4 ★

106 reviews

general_contractor

Cooper Well Drilling and Pump Service

8516 Cleveland Ave NW, North Canton, OH 44720

Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours

4.6 ★

30 reviews

general_contractor

Frequently Asked Questions

How much does a complete well installation cost in Pennsylvania?

A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.

What's included in a complete well installation?

A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.

How long does it take to install a complete well system?

The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.

More Well Installation Nearby

Related Services in Wooster

All services in Wooster, OH →