Best Well Installation in Coshocton, OH
Compare 5 local well installation providers in Coshocton. Verified listings with real contact info.
5 services listed
Quick Compare
Yoder Drilling & Geothermal Inc
Northwest, 997 OH 93, SUGARCREEK
Monday: 7:30 AM – 4:30 PM | Tuesday: 7:30 AM – 4:30 PM | Wednesday: 7:30 AM – 4:30 PM | Thursday: 7:30 AM – 4:30 PM | Friday: 7:30 AM – 4:30 PM | Saturday: Closed | Sunday: Closed
4.8 ★
34 reviews
American Drilling & Pump Service
3964 Stone Creek Rd SW, Stone Creek, OH 43840
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.2 ★
33 reviews
Hurley’s Water Well Drilling, LLC
10813 Pleasant Valley Rd NE, Frazeysburg, OH 43822
Monday: 8:00 AM – 10:00 PM | Tuesday: 8:00 AM – 10:00 PM | Wednesday: 8:00 AM – 10:00 PM | Thursday: 8:00 AM – 10:00 PM | Friday: 8:00 AM – 10:00 PM | Saturday: Closed | Sunday: Closed
4.5 ★
35 reviews
Keen Well & Pump
20279 Coshocton Rd, Mt Vernon, OH 43050
Monday: 7:00 AM – 3:00 PM | Tuesday: 7:00 AM – 3:00 PM | Wednesday: 7:00 AM – 3:00 PM | Thursday: 7:00 AM – 3:00 PM | Friday: 7:00 AM – 3:00 PM | Saturday: Closed | Sunday: Closed
4.3 ★
59 reviews
Martin's Well and Services, LLC
3607 Fallsburg Rd NE, Newark, OH 43055
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.8 ★
32 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.