Best Well Installation in Steubenville, OH
Compare 6 local well installation providers in Steubenville. Verified listings with real contact info.
6 services listed
Quick Compare
Curry Drilling LLC
518 Co Hwy 54, Richmond, OH 43944
Monday: 7:00 AM – 3:00 PM | Tuesday: 7:00 AM – 3:00 PM | Wednesday: 7:00 AM – 3:00 PM | Thursday: 7:00 AM – 3:00 PM | Friday: 7:00 AM – 3:00 PM | Saturday: Closed | Sunday: Closed
4 ★
6 reviews
Bernie Swogger Water Well
2754 PA-18, Hookstown, PA 15050
5 ★
1 reviews
Dunn Drilling
100 Forney Dr, Wheeling, WV 26003
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
2 reviews
Weaver Well Drilling & Excavating
145 Lyons Rd, West Alexander, PA 15376
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
2 reviews
Well Service Group, Inc.
190 Bilmar Dr #300, Pittsburgh, PA 15205
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.4 ★
5 reviews
Sean A Speedy Drilling
1057 Roswell Rd SW, Carrollton, OH 44615
5 ★
2 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.