Best Well Installation in Georgetown, OH
Compare 4 local well installation providers in Georgetown. Verified listings with real contact info.
4 services listed
Quick Compare
Myers Land Service
3359 Patterson Rd, Bethel, OH 45106
Monday: 9:00 AM – 8:00 PM | Tuesday: 9:00 AM – 8:00 PM | Wednesday: 9:00 AM – 8:00 PM | Thursday: 9:00 AM – 8:00 PM | Friday: 9:00 AM – 8:00 PM | Saturday: 9:00 AM – 8:00 PM | Sunday: Closed
4.7 ★
36 reviews
Anderson Irrigation and Outdoor Lighting
3284 Concord Hennings Mill Rd, Williamsburg, OH 45176
Monday: 8:00 AM – 4:00 PM | Tuesday: 8:00 AM – 4:00 PM | Wednesday: 8:00 AM – 4:00 PM | Thursday: 8:00 AM – 4:00 PM | Friday: 8:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
4.9 ★
139 reviews
Ohio Valley Pure Water
4139 S Yorkshire Square, Cincinnati, OH 45245
Monday: 8:00 AM – 6:00 PM | Tuesday: 8:00 AM – 6:00 PM | Wednesday: 8:00 AM – 6:00 PM | Thursday: 8:00 AM – 6:00 PM | Friday: 8:00 AM – 6:00 PM | Saturday: Closed | Sunday: Closed
5 ★
676 reviews
Gregory Drilling LLC
3154 Panhandle Rd, Lynchburg, OH 45142
Monday: 7:00 AM – 5:00 PM | Tuesday: 7:00 AM – 5:00 PM | Wednesday: 7:00 AM – 5:00 PM | Thursday: 7:00 AM – 5:00 PM | Friday: 7:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
5 ★
2 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.