Best Well Installation in Eaton, OH
Compare 7 local well installation providers in Eaton. Verified listings with real contact info.
7 services listed
Quick Compare
Barrett Well & Pump LLC.
5790 Gratis Rd, Camden, OH 45311
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.3 ★
43 reviews
LM Kettler Waterwell Drilling
2910 Endsley Rd, Richmond, IN 47374
5 ★
1 reviews
Louis M Kettler Water Well
4721 Old U.S. 27, Richmond, IN 47374
5 ★
3 reviews
Yeager Well Drilling & Pumps
4351 W Elkton Rd, Hamilton, OH 45011
Monday: 7:30 AM – 5:30 PM | Tuesday: 7:30 AM – 5:30 PM | Wednesday: 7:30 AM – 5:30 PM | Thursday: 7:30 AM – 5:30 PM | Friday: 7:30 AM – 5:30 PM | Saturday: Closed | Sunday: Closed
4.3 ★
43 reviews
Minnix Corporation - DBA Minnix Water Systems
5047 Lead Line Rd, Centerville, IN 47330
Monday: 9:00 AM – 5:00 PM | Tuesday: 9:00 AM – 5:00 PM | Wednesday: 9:00 AM – 5:00 PM | Thursday: 9:00 AM – 5:00 PM | Friday: 9:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.7 ★
6 reviews
Riddle Well Drilling
7347 Upper Miamisburg Rd, Miamisburg, OH 45342
4.3 ★
7 reviews
Well Drilling Dayton Ohio
1111 E 5th St #2024, Dayton, OH 45401
Monday: 9:00 AM – 5:00 PM | Tuesday: 9:00 AM – 5:00 PM | Wednesday: 9:00 AM – 5:00 PM | Thursday: 9:00 AM – 5:00 PM | Friday: 9:00 AM – 5:00 PM | Saturday: 9:00 AM – 5:00 PM | Sunday: Closed
5 ★
1 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.