Best Well Installation in Bowling Green, OH
Compare 7 local well installation providers in Bowling Green. Verified listings with real contact info.
7 services listed
Quick Compare
William's Pump Services & Well Drilling
706 W Gypsy Lane Rd, Bowling Green, OH 43402
Able Well Drilling
14962 Sand Ridge Rd, Bowling Green, OH 43402
Monday: 8:00 AM – 4:00 PM | Tuesday: 8:00 AM – 4:00 PM | Wednesday: 8:00 AM – 4:00 PM | Thursday: 8:00 AM – 4:00 PM | Friday: 8:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
4.8 ★
44 reviews
Shidler & Wilder Wells & Pumps
Maumee, OH 43537, USA
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
5 ★
3 reviews
Kimball Well Drilling
2320 N Billman Rd, Genoa, OH 43430
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.9 ★
12 reviews
Mock's Well Drilling
3859 Co Rd C, Swanton, OH 43558
5 ★
2 reviews
Walter's Well Drilling
124 Highland Ave, Delta, OH 43515
5 ★
15 reviews
Precision Well and Septic LLC
N607 Co Rd 15C, Napoleon, OH 43545
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
93 reviews
Frequently Asked Questions
How much does a complete well installation cost in Pennsylvania?
A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.
What's included in a complete well installation?
A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.
How long does it take to install a complete well system?
The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.